2020-9-28 18:07 |
A capsule was laid on the construction site of a gold recovery plant complex and a tailing dump at Terek-Sai deposit in Chatkal district of Jalal-Abad region. Kyrgyzaltyn OJSC reported.
Подробнее читайте на 24.kg ...
2020-9-28 18:07 |
A capsule was laid on the construction site of a gold recovery plant complex and a tailing dump at Terek-Sai deposit in Chatkal district of Jalal-Abad region. Kyrgyzaltyn OJSC reported.
Подробнее читайте на 24.kg ...
Construction of a gold recovery plant and a tailing dump began at Jerooy deposit. A capsule for construction was laid the day before. 24.kg »
2017-11-24 12:19